-
December 4, 2020
CTA is pre-qualified for the $49M Raymond Shaw Elementary School project in Millbury, MA. Designed by Turowksi 2 Architects, the project is a new 90,00sf, two story building with new parking lots, turf and grass sports fields. It includes the demolition of the existing school. The project will be in three phases.
-
November 18, 2020
The following appeared in Banker & Tradesman on November 18, 2020:
Army Biomechanics Labs Break Ground in Natick
Waltham-based CTA Construction has broken ground on an 80,600-square-foot training facility for the U.S.Army at the Natick Soldier Systems Center.
-
November 13, 2020
The 80,600 square-foot facility at U.S. Army Natick Soldier Systems Center
will host research to optimize soldier performance and combat readiness
-
October 20, 2020
CTA is pre-qualified for the $68M Rockland Elementary School project in Rockland, MA. Designed by SMMA Architects, the project is a new 121,00sf, two story building with new parking lots, turf and grass sports fields. It includes the abatement and demolition of the existing school.
-
September 29, 2020
New 50,000 square foot building features digital media lab, community meeting space, amphitheater and other amenities
-
September 23, 2020
The 80,600 square-foot facility will enable research and practical study to optimize soldier and squad performance and enhance combat readiness
-
September 18, 2020
The following appeared in the New England Real Estate Journal on September 18, 2020 and can be found here: https://nerej.com/cta-construction-completes-new-50-000-s-f-tufts-library
-
September 16, 2020
Hybrid learning is underway with students occupying revamped Burrell every day
-
September 3, 2020
The following was published by the Patriot Ledger on September 2, 2020. The full article can be accessed here: https://www.patriotledger.com/news/20200902/new-library-among-best-in-state
-
August 10, 2020
Major milestone in construction of $16.6 million project due for completion in 2021